The Compliance Report displays the quantity achieved and quantity still needed to meet the annual requirement. The report will also show how many of the Credits are Renewable Energy Credits, Incentive Renewable Energy Credits, Advanced Cleaner Energy Credits (and whether the ACE Credits are from a plasma facility or not), and whether the Credits are from project owned by the Electric Service Provider.
NOTE: Information on Compliance for Energy Waste Reduction can be found in the Energy Waste Reduction (EWR) section of the MIRECS Help Center.
- Log into MIRECS.
- Locate the “Open Sub-Account” module and select the hyperlinked ‘Sub-Account Name’ to access the relevant Compliance (Active) Sub-Account.
- From the Edit Sub-Account screen, Click on the ‘Compliance Report’link
The Compliance Report contains the following fields:
Field |
Value |
Annual requirement (MWH) |
Total MWh required to meet the annual compliance requirements |
Total Quantity Retired |
Total Credits (IREC, ACEC, REC, EWR) deposited |
RECs Retired |
Total RECs deposited |
IRECs Retired |
Total IRECs deposited |
EWRs |
Total EWR Credits deposited |
Compliance EWR % |
Percentage of the total compliance that is being met with EWR Credits (max will be 10.00%) |
ACEC Retired (Plasma) |
Total ACECs (Plasma) deposited |
ACEC Retired (Industrial Cogeneration) |
Total ACECs (Industrial Cogeneration) deposited |
ACECs (Other) |
Other ACECs deposited |
Maximum ACEC Substitution for projects with COD before January 1 2008 (Non Plasma) |
7% of the total mandate can be substituted with certificates from ACEC Systems with COD prior to January 1 2008 |
Maximum ACEC Substitution for projects with COD after January 1 2008 (Non Plasma) |
10% of the total mandate can be substituted with certificates from ACEC Systems with COD after to January 1 2008 |
Percentage of certificates owned by an Electric Service Provider or its affiliate PA295 Sec. 33 (1) (a): * |
Percentage of Certificates from projects with the “Electric Service Provider or its affiliate PA295 Sec. 33 (1) (a)” selected in the project Registration |
Percentage of Mandate Achieved |
Total Quantity Retired/ Annual requirement (MWH) |
Difference between |
Value of how the compliance requirement is achieved with deposited certificates. |
Additional articles relating to Compliance can be found in the Compliance Section of the MIRECS User Guide.
- MPSC Review of Compliance Filing
- MIRECS Compliance Reporting and Transferring Certificates to a Compliance Sub-Account